..were sent to Baku. During the construction on several sections certain special methods of application were used: cement, silication and kesson.
 Under such complex conditions Baku Metro was constructed. It should be noted that the entire rigging of the constructions, non-standard equipment, pawn details were developed on the mechanical engineering enterprises of the republic. After the first section was set in motion, the second one (which was 2,3 km) and third one (6,4 kilometers) connected the largest dwelling massif "8 kilometer" and industrial zone with the center of the. Second order (9,1-km length) passed through northwestern part of Baku and was finished in 1985 with construction of five stations, two of which were deeply laid. station of Metro are deeply laid. There are 30 escalators of five types with common length of ladder linen more than 4000 meters. The common length of tunnel constructions is more than 77,1 km.
 The uniqueness of Baku Metro is that its routes are constructed on the intersected relief of the city, located on the hilly area, and have 60% and 40% thousand inclines and various curvatures of small radius. In the process of construction and operation of the first orders of Baku. In Metro the number of builders and operators was growing. Among them was the head of Baku Metro Ahmedov Taghi Mahammad oglu, who passed through such passage as being an ordinary worker to becoming the head boss of Metro. Many leaders of the Metro and its sections worked in their native collective for more than 30 years. Knowledge and obtained experience during these years of work permit them successfully manage the leadership responsibilities in this complex and multi-branched ownership, and many thousands

tunnel stages, mine barrels and metal construction. From 1977 till the present time more than 50 km of tunnels were protected, along with mine barrels and passage manufactures, various metal constructions. As known, in 1993 and 1995 there were terrorist acts conducted in Baku Metro, which lead to tragedy-death of people and various problems with technology, trains and station equipment.
 With goals to prevent such acts and for harsher control over the passage and location of passengers in Metro on all entrances and exits, platform stations and escalators is organized. Currently there is a development of televised control with showing on monitors, which are located in dispatcher's center and station's administrators.
In goals of improving the etiquette of service of passengers, also for correct measurements of numbers of passengers, going through ACP, in current time there are works for improvement old ACP-73 with modernization of their electrical aspect, for use of tokens along with a new system of payment with smart-cards with data showing on a personal computer and monitor. Computerization of development processes, introduction of computers in working places improve the operation on the job. In perspective the length of Baku Metro lines will reach 52 km, in two-point numbers, and the amount of stations--32.  There will be a development of second electro-depot in the northwestern part of mountain region of the city among the construction of a powerful mechanical base for repairs of the train park, production of details, knots and spare parts. With pride it should be noted that the activity of Baku Metro was always under intent attention of the President of Azerbaijan Republic Heydar Alirza oglu Aliyev. At the time due to his immediate control and help a very complex and the lengthiest lane of second order was developed and began operation in Baku Metro. Knowing the needs, difficulties and problems of the Metro not just by hearing about them, Heydar Alirza oglu Aliyev, always attentive and welcoming in response to needs of Metro and collective's appeals.